A new 37,500 SF pre-engineered building for Cox Engineering, including: an extensive site work job with a new 600’ main entrance to the property, reworking of the existing parking lot, and a new 800-amp service. Hyde was the last permit issued (3-17-2020) at the start of the pandemic and turned over the building with an occupancy date of 11-24-2020. Project came in under budget at $5.1 million.